American Parking Control was the contractor hired to install 12″ of limestone flexbase on this industrial lot. To ensure stability and proper drainage for the project, we began by stripping a lot of debris and soil as needed to create a solid base. The property was graded to create proper drainage followed by a 12-inch layer of limestone flexible. We also completed a 20,000sf warehouse foundation with intricate supports for heavy-duty cranes.
Recent Posts
Archives
- April 2022
- March 2022
- February 2022
- January 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- January 2019
- November 2018
- October 2018
Categories
- Asphalt
- Asphalt Driveway
- Asphalt Maintenance
- Asphalt Pavement
- asphalt resurfacing vs replacement
- Asphalt Texture
- bitumen vs asphalt
- Blog
- Chip Seal Vs. Asphalt
- Cold Patch Asphalt
- Commercial Construction
- Concrete Construction
- concrete finishing company
- Concrete Flatwork
- Concrete pool deck ideas
- concrete road construction
- Dirt Work Precautions
- Driveway Edging
- front walk
- House Pad Information
- land clearing services
- oil stains
- Parking Lot
- Pave a driveway
- Potholes
- Preparation Services
- Press Release
- Residential Drainage System
- Right Asphalt Paint
- Site Preparation