American Parking Control was the contractor hired to install 12″ of limestone flexbase on this industrial lot. To ensure stability and proper drainage for the project, we began by stripping a lot of debris and soil as needed to create a solid base. The property was graded to create proper drainage followed by a 12-inch layer of limestone flexible. We also completed a 20,000sf warehouse foundation with intricate supports for heavy-duty cranes.