Commercial Foundation

Commercial Foundation APC completed a 13,000 ft  foundation as well an additional 6,000 Sq Ft concrete paving job in Conroe Texas. 

City of Pattison

City of Pattison American Parking Control was contracted to perform municipal paving and drainage improvements for the City of Pattison, Texas. This extensive project included excavation of roadways, installation of HDPE drainage pipe, regarding reducing existing undulation followed by lime stabilization, Crushed Concrete flexible, and the finished asphalt surface course. Our participation in the project.

Village Square Foundation

Village Square Foundation American Parking Control played a big part in the construction of this 10,000 sq. ft. retail location. We took the project from a bare piece of land to the completed concrete foundation for the commercial building and paving of a 35,000 sq. ft. concrete parking lot. Our role in the project included: …

Village Square Foundation Read More »

Fire Training Facility

Fire Training Facility American Parking Control was proud to be part of this state-of-the-art firefighter’s training facility in Baytown. Our participation in this unique project included the construction of the concrete foundations for the classroom training building and the 4-story rescue training tower. In addition, we also constructed 8 ft. concrete walls for the trench …

Fire Training Facility Read More »

Tomball Parkway

28520 Tomball PKWY Location: Tomball, TX Timeline: 2 days Description: Scope of Work: Completed asphalt overlay for a utility trench cut and filled by others. Approximately 3500 sf of area which required 3.5″ of asphalt overlay. Location: Baytown Timeline: 4 days Description: Regrading of ~35,000 sf of area to address existing potholes which were identified …

Tomball Parkway Read More »

Pinnacle Propane

Pinnacle Propane Location: Baytown Timeline: 4 days Description: Regrading of ~35,000 sf of area to address existing potholes which were identified as risks to the operation of large propane trucks around the property, as well as improvement of an apron driveway coming in off the service road. We placed 10 tons of lime in two …

Pinnacle Propane Read More »

Woodlands Fountain

Woodlands Fountain Location: Woodlands, TX Timeline: 12 Days Description: Form prep and pour columns, beams and flatwork as designed by engineer.

Busch

Anheuser Busch Asphalt Paving Location: Houston, TX – Gellhorn Plant Description: Asphalt placement on approximately 1,269sf (around ramp concrete). Additional Asphalt patches – approx. 368sf Approx. All hand-work in tight space with full PPE for plant work. Scope: Ensure base is free of standing water, tack vertical surfaces at tie-ins, place asphalt and compact with …

Busch Read More »